【24h】

PetroSA moves deeper into the mire

机译:PetroSA深入泥潭

获取原文
获取原文并翻译 | 示例
           

摘要

South Africa's state oil company PetroSA has been pushed into further turmoil and has asked three top executives to take special leave pending an investigation into their performance. The leadership uncertainty follows poor performance at PetroSA with problems including delays and cost overruns at its upstream Project Ikh-wezi. This was designed to bring in extra gas reserves to extend the life of the GTL plant at Mossel Bay via live new high-pressure high-temperature wells at the F-O field.
机译:南非国家石油公司PetroSA陷入了进一步动荡,并要求三名高级管理人员休特别假,以对其绩效进行调查。领导层的不确定性是由于PetroSA的业绩不佳,以及上游项目Ikh-wezi的延误和成本超支等问题。这样做的目的是通过在F-O现场使用新的高压高温井来引入额外的天然气储备,从而延长Mossel湾GTL工厂的寿命。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号