【24h】

Technip slims for Chevron in Angola

机译:Technip在安哥拉为Chevron瘦身

获取原文
获取原文并翻译 | 示例
       

摘要

Tech nip is understood to be working alone on a new double platform project for Chevron off Angola after the US major decided to reduce the size of the original Greater Vanza Longui Area (GVLA) development and turn it into just Greater Longui Area (GLA). Originally Technip and EDG were lined up for the front end engineering and design for two wellhead platforms, a processing and compression platform and a quarters and utilities platform for GVLA in Block 0 off Cabinda. Technip was to work on the central platform and EDG to study the wellhead platforms and pipelines and brownfield work.
机译:据了解,在美国少校决定缩小原始的大凡扎隆吉地区(GVLA)开发规模并将其转变为大隆吉地区(GLA)之后,Tech nip独自为安哥拉雪佛龙公司的新双平台项目工作。最初,Technip和EDG排队进行卡宾达(Cabinda)零区块GVLA的两个井口平台,一个处理和压缩平台以及一个宿舍和公用事业平台的前端工程和设计。 Technip将在中央平台和EDG上进行研究,以研究井口平台和管道以及褐地作业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号