【24h】

Tullow pushing for early Ghana tie-back

机译:敦促加纳尽早追回

获取原文
获取原文并翻译 | 示例
       

摘要

The partners in what was once touted as an FPSO project off Ghana for Kosmos Energy will finish the appraisal this year but are heading to a decision to tie-back to the existing Jubilee FPSO with Tullow pushing for early production. The Mahogany/Teak/Akasa (MTA) development on Kosmos Energy's West Cape Three Points block had once been touted as a separate FPSO project. However, there was a disappointing appraisal of the Teak discovery in 2012 and the reserves were not changed following an appraisal well on Akasa completed earlier this year.
机译:在加纳附近为Kosmos Energy进行的FPSO项目中,曾被吹捧的合作伙伴将在今年完成评估,但将决定与Tullow推动现有的Jubilee FPSO挂钩,以推动早期生产。曾经被吹捧为Kosmos Energy西开普三点区块的桃花心木/柚木/阿卡萨(MTA)开发项目,是一个单独的FPSO项目。但是,2012年对柚木的发现进行了令人失望的评估,并且在今年早些时候完成的Akasa的评估井之后,储量没有改变。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号