...
首页> 外文期刊>Journal of Engineering & Applied Sciences >Optimization of Time and Cost in Critical Chain Project Scheduling Problem Using Genetic Algorithm
【24h】

Optimization of Time and Cost in Critical Chain Project Scheduling Problem Using Genetic Algorithm

机译:基于遗传算法的关键链项目调度问题的时间和成本优化

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Time and costs are considered as the major criteria in a project and project managers always seek to finish projects in the shortest possible time spending the lowest costs to obtain success in projects. One of the major challenges in this regard is to select a proper approach in order to achieve the above goals. Since, costs and time are regarded as two major aspects in doing construction projects, the purpose of this research is to optimize these two factors. In the process of optimizing the period of doing the project, a tolerance is considered for the project costs, so that the optimal conditions in the acceptable range for the costs and time of doing the project are specified. The genetic algorithm has been utilized in this research for optimization of the project time and costs. The critical chain method has also been used for project scheduling.
机译:时间和成本被认为是项目的主要标准,项目经理始终寻求在最短的时间内完成项目,以支出最低成本以获得项目成功。 这方面的主要挑战之一是选择适当的方法,以实现上述目标。 由于,成本和时间被视为建设项目的两个主要方面,本研究的目的是优化这两个因素。 在优化项目期间的过程中,考虑了项目成本的公差,从而指定了可接受范围内的最佳条件和执行项目的时间。 遗传算法已在本研究中用于优化项目时间和成本。 关键链方法也已用于项目调度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号