首页> 外文期刊>Africa oil and gas: Breaking news and analysis from Africa >BP reveals Africa project list with mixed messages for Angola
【24h】

BP reveals Africa project list with mixed messages for Angola

机译:BP透露非洲项目清单,对安哥拉的喜忧参半

获取原文
获取原文并翻译 | 示例
           

摘要

BP is to move ahead with a series of projects across Africa despite the current oil price fall although some of the major Angolan developments remain uncertain. The company highlighted its upstream future at a presentation in London yesterday. From projects currently in the design phase, it is expecting first output from the West Nile Delta Taurus and Libra fields off Egypt in 2017 following a final investment decision in the first half of next year and output from the Giza/Raven and Fayoum fields in the same project in the following year. In 2018 Zinia Phase 2 off Angola will also start up. Projects under appraisal for the same time frame include Dalia 1B off Angola and East Nile Delta off Egypt. However, the major Block 18 PCC and Block 31 SE FPSO projects off Angola, which have already been delayed for several years with rumours of uncommerciality, are mentioned only as being "in the pipeline" to 2020 and beyond - they are not included in the timetable for first production by 2020.
机译:尽管目前的油价下跌,但尽管安哥拉的一些主要发展仍不确定,但BP将继续在非洲开展一系列项目。该公司昨天在伦敦的一次演讲中强调了其上游的未来。根据目前处于设计阶段的项目,预计在明年上半年做出最终投资决定后,埃及西尼罗河三角洲的金牛座和天秤座油田将在2017年获得第一批产量,吉萨/乌鸦和法尤姆油田的产量将在明年第一季度得到满足。第二年是同一项目。安哥拉的Zinia二期工程也将在2018年启动。在同一时间段内正在评估的项目包括安哥拉附近的Dalia 1B和埃及附近的东尼罗河三角洲。但是,安哥拉以外的18号PCC和31号SE FPSO大型项目已经被推迟了几年,并传出了非商业性的传闻,但这些项目仅被提及到2020年及以后,“正在筹划中”,但并未包括在内。到2020年首次生产的时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号