...
首页> 外文期刊>Journal of Enterprise Information Management >Analyzing time pressure for software economics Empirically evaluating team factors as the strategic criteria
【24h】

Analyzing time pressure for software economics Empirically evaluating team factors as the strategic criteria

机译:分析软件经济学经验评估团队因素作为战略标准的时间压力

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Purpose The research on people and project factors is found extensively in general but not specific to software engineering. Secondly, the existing research has not concentrated on the communication and time complexity of the teams on software economics. The purpose this paper is to develop a model to investigate and quantify the impact of time pressure (TP) on software economics through the communication influence of software team sizes (TS). Design/methodology/approach A research model and five hypotheses are developed based on the gaps in the literature. The data set from International Software Benchmarking Standards Group repository is used for testing the hypotheses. Findings Important findings include: smaller TS tends to exert less TP on average; TP is directly proportional to software economics, however; and TP does not affect the productivity required for the software. Research limitations/implications - The study has the following implications: Selection of an appropriate TS for project completion that ensures minimum pressure on team members; and maximize software outcomes in stress-free environment. Practical implications - This work is useful for organizations carrying out software projects with teamwork. The project managers can benefit from the results while planning the team factors for achieving the project goals. Social implications The results uphold not to exert pressure on the team as it will not only affect the duly completion of the project but also the well-being of employees. Originality/value The paper is the first one where the proposition of TP estimation is done using TS and communication complexity, and empirically evaluating the impact of TP on four major software economics are the major key contributions of this research work.
机译:目的,人们和项目因素的研究是广泛的,但没有特定于软件工程。其次,现有的研究没有集中在软件经济学团队的沟通和时间复杂性上。本文的目的是通过软件团队尺寸(TS)的通信影响,开发一种模型来调查和量化时间压力(TP)对软件经济学的影响。设计/方法/方法是基于文献中的差距开发了研究模式和五个假设。来自国际软件基准标准组存储库的数据集用于测试假设。结果表明重要研究结果包括:较小的TS平均倾向于施加较少的TP;然而,TP与软件经济学成正比; TP不会影响软件所需的生产率。研究限制/含义 - 该研究具有以下影响:选择适当的TS,以确保团队成员的最低压力;并最大化无压力环境中的软件结果。实际意义 - 这项工作对于开展与团队合作的软件项目的组织有用。项目经理可以从结果中受益,同时规划达到项目目标的团队因素。社会影响结果坚持不对团队施加压力,因为它不仅影响项目的适当完成,而且影响员工的福祉。原创性/值本文是第一个使用TS和通信复杂性完成TP估计的主张,并经验对TP对四大软件经济学的影响是本研究工作的主要关键贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号