Purpose - The construction industry is characterized by a long construction period, high cost and many uncontrollable factors. The owners and contractors are increasingly focusing on the efficiency of their construction and costs in pursuit of greater economic benefits. However, current methods used in the construction period and cost optimization analysis with multiple constraints the have their own limitations. Therefore, this study aims to propose a combination of genetic algorithm (GA) and building information modeling (BIM) to construct a five-dimensional construction duration-cost optimization model with the advantages of optimization and simulation for optimization. Design/methodology/approach - This design first analyzed the characteristics of changing construction period and cost and then improved the genetic mechanism and the data processing method in the GA according to the aforementioned characteristics. Then, BIM technology was combined with GA to testify the feasibility of the model in the practical engineering project. Findings - The result proved that this new method was reasonable and effective in dealing with the complicated problem of period and cost. GA accelerated the optimization process and yielded a reliable Pareto solution. BIM technology simulated the construction process before construction to increase the feasibility of the construction scheme. Originality/value - This method not only can rapidly provide the best construction period/cost decision to the architect according to the previous working period/cost or contract data that can meet the demands of the architect but also visualize the construction and give a dynamic schedule of the project.
机译:目的 - 建筑行业的特点是施工期长,成本高,不可控制的因素。业主和承包商越来越关注其建筑的效率和追求更大的经济效益的成本。然而,在施工期间使用的当前方法和成本优化分析,具有多个约束具有自身限制。因此,本研究旨在提出遗传算法(GA)和建筑信息建模(BIM)的组合来构建五维施工持续时间成本优化模型,优化优化以进行优化。设计/方法/方法 - 本设计首先分析了施工时期和成本的变化特性,然后根据上述特征改善了GA中的遗传机制和数据处理方法。然后,BIM技术与GA合并,以证明实际工程项目模型的可行性。结果 - 结果证明,这种新方法在处理期间和成本的复杂问题方面是合理的,有效的。 GA加速优化过程,并产生了可靠的帕累托解决方案。 BIM技术模拟建设前的施工过程,以提高施工方案的可行性。原创性/值 - 此方法不仅可以根据先前的工作期/成本或合同数据迅速提供对架构师的最佳施工期/成本决定,可以满足建筑师的需求,但也可视化施工并提供动态时间表项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号