【24h】

Maersk meets to thin Angolan Chissonga list

机译:马士基会见安哥拉奇松加清单

获取原文
获取原文并翻译 | 示例
       

摘要

Maersk is holding meetings with the remaining bidders for the FPSO and tension leg wellhead platform (TLWP) for the deep-water Chissonga project off Angola as it tries to thin the list. For the FPSO the only two remaining bidders are SBM and Modec, after BW Offshore and Teekay slipped off late last year. SBM has a long history of winning contracts in Angola and will currently be hurting after apparently losing out on the double FPSO Kaombo project for Total off the country. If rumours are true and Modec will be winning a large portion of the FPSO work for Total, then its desire and ability to conduct two contracts so close together may be in doubt. The pair are also talking to Cobalt International about another 100,000 b/d FPSO for Cameia off Angola.
机译:马士基正与剩余的FPSO和安哥拉深水Chissonga项目张力腿井口平台(TLWP)的投标人举行会议,因为它试图缩小名单。对于FPSO,在去年年底BW Offshore和Teekay退出之后,剩下的仅有两个竞标者是SBM和Modec。 SBM在安哥拉赢得合同的历史由来已久,在显然因在道达尔(Total)以外的双重FPSO Kaombo项目中输掉比赛之后,目前将受到伤害。如果谣言属实,并且Modec将为Total赢得FPSO的大部分工作,那么它是否渴望和如此紧密地签订两份合同的能力可能会受到质疑。两人还正在与国际钴业公司(Cobalt International)就安哥拉以外的卡梅亚(Camelia)的另外100,000 FP / d FPSO进行商谈。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号