【24h】

Gabonese deep pre-salt test delay

机译:加蓬深层预盐测试延迟

获取原文
获取原文并翻译 | 示例
           

摘要

Drilling of Total's highly anticipated deepwater pre-salt wildcat off Gabon has been put back until next quarter as the drill-ship has been delayed with the French operator off Cote d'Ivoire. The Diaman (formerly Mango) exploration well was originally expected to spud in mid-February using the Ocean Rig Olympia but this has been put back to the second quarter.
机译:道达尔备受期待的加蓬深水预盐野猫钻探工作已推迟至下个季度,因为法国船东科特迪瓦下水了钻探船。最初预计Diaman(以前为Mango)勘探井将在2月中旬使用Ocean Rig Olympia进行开钻,但已推迟至第二季度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号