【24h】

Total drilling in Mauritania

机译:毛里塔尼亚的总钻探量

获取原文
获取原文并翻译 | 示例
       

摘要

Total is drilling ahead on a well onshore Mauritania with Repsol to follow in neighbouring acreage. The well is being drilled in Ta7 in the Taoudeni Basin where 1,000km of new 2D seismic was shot in 2010. This was the same year that Total completed its first wildcat in the basin in Ta8. Results from the well were disappointing. The well had been expected to take around three months but took more than three times as long.
机译:道达尔(Total)正在与毛利塔尼亚(Repuri)一起在毛里塔尼亚(Maruritania)的一口井上钻探,以跟随邻近的土地。该油井正在陶德尼盆地的Ta7井中钻探,2010年在该井中发生了1,000公里的新2D地震。同年,道达尔在Ta8盆地完成了其第一只野猫。油井的结果令人失望。该井原本预计耗时三个月左右,但耗时却是原来的三倍以上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号