【24h】

Bids in for new Eni Ghana phase

机译:新的埃尼加纳阶段招标

获取原文
获取原文并翻译 | 示例
           

摘要

Eni has now received technical bids for the second phase of its Offshore Cape Three Points project off Ghana only weeks after finalising the first. The latest stage will develop the gas reserves which are due to start production in 2018. It involves five wells - two on Sankofa Main, two on Sankofa East and one on Gye Name. There will also be the associated subsea system, gas treatment facilities on the FPSO, a 63km subsea gas pipeline with two lay barges needed, an onshore receiving facility and tie-in with the GNPC sales gas pipeline.
机译:埃尼(Eni)现在已经完成了对加纳海上三点石油(Cape Off Point)的第二阶段的技术招标,而这仅是在第一阶段完成后的数周。最新阶段将开发天然气储备,该天然气储备将于2018年开始生产。它涉及五口井,其中两口在Sankofa Main上,两口在Sankofa East上,一口在Gye Name上。还将有相关的海底系统,FPSO上的天然气处理设施,一条需要两个铺设驳船的63公里海底天然气管道,一个陆上接收设施以及与GNPC销售天然气管道的连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号