首页> 外文期刊>AIChE Journal >Scheduling Multistage Batch Plants with Sequence-Dependent Changeovers
【24h】

Scheduling Multistage Batch Plants with Sequence-Dependent Changeovers

机译:安排具有序列相关转换的多阶段批处理工厂

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This article deals with the optimal short-term scheduling of multistage batch plants with parallel units and sequence-dependent changeovers,together with the optimal selection of the number and size of batches to be produced.A new resource-task network-based,multiple time-grid continuous-time formulation is proposed that explicitly considers a virtual,shared,intermediate storage unit per stage to keep track of material transfer between processing units belonging to consecutive stages of production.Adequate material transfer is implicitly ensured through mass balances and timing constraints relating the times of event points of dissimilar grids.The new formulation is compared with a conceptually different approach from another research group.The results for several example problems show that the new formulation is tighter,typically requiring fewer event points to find the global optimal solution,and is significantly more efficient computationally.The results also show that for single batch problems other approaches are preferable.
机译:本文讨论了具有并行单元和依赖于序列的转换的多级批处理工厂的最佳短期调度,以及要生产的批处理数量和大小的最佳选择。一种基于新的资源任务网络的多时间方法提出了网格连续时间公式,该公式明确地考虑了每个阶段的虚拟,共享,中间存储单元,以跟踪属于连续生产阶段的处理单元之间的物料转移。通过质量平衡和相关的时间限制隐式地确保了足够的物料转移新公式与另一研究小组在概念上不同的方法进行了比较。几个示例问题的结果表明,新公式更严格,通常需要更少的事件点才能找到全局最优解,结果也表明对于单个ba其他问题最好采用其他方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号