首页> 外文期刊>World Steel Capacity News >NLMK COMPLETES RECONSTRUCTION OF BF NO.6
【24h】

NLMK COMPLETES RECONSTRUCTION OF BF NO.6

机译:NLMK完成了BF No.6的重建

获取原文
获取原文并翻译 | 示例
           

摘要

NLMK completed the repairs of the BF No.6, one of the re-equipping projects under its updated Strategy 2022. The project will allow the company to boost pig iron and steel output as well as to reduce its environmental footprint. NLMK commissioned the BF No.6, which had been in reconstruction since May. The unit’s capacity increased from 3.1 million t to 3.4 million t after the upgrade. Besides, new air treatment systems will allow for the capture of almost 100% of dust particles, Metal Expert learnt.
机译:NLMK完成了BF No.6的维修,其中一个重新装备项目之一在其更新的策略之下的2022年。该项目将允许该公司促进猪铁和钢铁产量,并减少其环境足迹。 NLMK委托了BF No.6,自5月以来一直在重建。 升级后,该单位的能力从310万吨增加到340万吨。 此外,新的空气处理系统将允许捕获近100%的尘埃粒子,所学知的金属专家。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号