...
首页> 外文期刊>WSEAS Transactions on Environment and Development >Issues associated with the implementation of wind energy power generation in isolated and non-interconnected rural areas - case study
【24h】

Issues associated with the implementation of wind energy power generation in isolated and non-interconnected rural areas - case study

机译:与孤立和非相互联系的农村地区风能发电实施相关的问题 - 案例研究

获取原文
获取原文并翻译 | 示例

摘要

Analysis of difficulties and issues related to the design, construction, transportation, installation and operation of two single-blade wind turbines type as part of a hybrid project to supply electrical energy to an isolated rural community in northern of Colombia are discussed in this paper. This study modeling aerodynamic forces, as well as the analysis the materials used in the construction stage, welding analysis and control systems. This investigation indicates the difficulty to provide stability of civil and mechanical structures of wind turbines without a complete assurance of installation. Most significant issues associated to the development this case including the lack of plan strategy and deficient supervision during construction stages.
机译:本文讨论了两个单刀片风力涡轮机类型的设计,施工,运输,安装和运行,包括两个单刀风力涡轮机类型的困难和问题,作为混合工程,以供应电能到哥伦比亚北部的孤立的农村社区。 本研究建模空气动力,以及分析施工阶段,焊接分析和控制系统中使用的材料。 本调查表明,难以提供风力涡轮机的民用和机械结构的稳定性,而无需完全保证安装。 与发展的最重要问题与此案例相关,包括缺乏计划战略和施工阶段的监督不足。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号