...
首页> 外文期刊>World rig forecast >Lamprell cuts steel on second ARO newbuild
【24h】

Lamprell cuts steel on second ARO newbuild

机译:Lamprell在第二个Aro NewBuild上切割钢

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Lamprell and International Maritime Industries(IMI)have cut steel on the second of two newbuild jackups for ARO Drilling at Lamprell's Hamriyah facilities.The two rigs are being built collaboratively between IMI and Lamprell,with Lamprell's share of project value amounting to around USD 350 million.Most of the fabrication work is taking place at Lamprell's UAE facilities,traning IMI personnel to become rig experts before the units are commissioned in 2022 at the Saudi Arabia facility.The rigs will be based on the LeTourneau Super 116E Class design.Upon delivery,each unit is expected to commence an eight-year contract with Saudi Aramco and operate at a day rate determined by a six-year EBITDA payback.
机译:Lamprell和国际海事行业(IMI)在Lamprell的Hamriyah设施中的两家新纽伯联杰克的第二次新建的Jumbuild Juckup削减了钢铁。这两台钻机正在IMI和Lamprell之间合作建造,Lamprell的项目价值份额约为3.5亿美元。 。在Lamprell的阿拉伯联合酋长国设施中,在Lamprell的阿拉伯联合酋长国设施进行了大部分制作工作,以便在沙特阿拉伯设施2022年在2022年在2022年委托之前成为钻机专家。钻机将基于Letourneau Super 116e Class Design.Upon交付, 预计每个单位将开始与沙特阿美公司的八年合同,并在六年EBITDA投资回报确定的日价下运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号