首页> 外文期刊>Wire Journal International >Prysmian wins contract to supply 90 km of inter-array cables for offshore wind farm
【24h】

Prysmian wins contract to supply 90 km of inter-array cables for offshore wind farm

机译:Prysmian赢得了近岸风电场阵列阵列阵列的合同

获取原文
获取原文并翻译 | 示例
           

摘要

The Prysmian Group has won a contract worth approximately {EUR}80 million to provide the submarine inter-array cable systems for the Saint-Brieuc offshore wind farm in France. A press release said that Prysmian will provide some 90 km of three-core 66 kV HVAC XLPE-insulated inter-array cables. The cable cores will be manufactured at the Group's sites in its French plants in Montereau-Fault-Yonne and Gron, and then be assembled and finished in its German plant in Nordenham, providing the French market with Prysmian's state-of-the-art cable systems manufactured locally. Delivery and commissioning are scheduled for the end of 2022.
机译:PrySmian集团赢得了价值约8000万亿欧元的合同,为法国圣Brieuc离岸风电场提供潜艇间电缆系统。 新闻稿说,Prysmian将提供约90公里的三核66 kV HVAC XLPE绝缘阵列电缆。 电缆核心将在本集团的植物中,在Montereau-Fault-Yonne和Gron中的法国植物中制造,然后在其德国工厂组装并在诺登汉姆完成,提供法国市场与Prysmian的最先进的电缆 在本地制造的系统。 交付和调试计划于2022年底。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号