【24h】

Statnett Transforms System Security

机译:Statnett转换系统安全性

获取原文
获取原文并翻译 | 示例
       

摘要

To improve reliability, the contingency plans of the Norwegian TSO now include spare extra-high-voltage transformers. The need for a new policy on spare extra-high-voltage (EHV) transformers emerged in 2011 when Statnett, the Norwegian transmission system operator (TSO), commenced a huge investment and reinvestment program. New renewables in the form of wind farms and a large number of small-scale hydro power plants were being connected to the TSO's 300-kV transmission system in areas with surplus energy. The energy had to be either transmitted to areas in Norway with an energy deficit or, alternatively, exported to other countries.
机译:为了提高可靠性,挪威TSO的应急计划现在包括备用超高压变压器。 在挪威传输系统运营商(TSO)的2011年当挪威传输系统运营商(TSO)中出现了对备用超高电压(EHV)变形金的新政策的需求开始了巨额的投资和再投资计划。 风电场形式和大量小型水力发电厂的新可再生能够在具有剩余能量的地区连接到TSO的300千伏传输系统。 能量必须传播到挪威的区域,以能源赤字或者,或者,出口到其他国家。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号