首页> 外文期刊>Transactions of the ASABE >SWAT plus VERSUS SWAT2012: COMPARISON OF SUB-DAILY URBAN RUNOFF SIMULATIONS
【24h】

SWAT plus VERSUS SWAT2012: COMPARISON OF SUB-DAILY URBAN RUNOFF SIMULATIONS

机译:SWAT Plus与SWAT2012:子日城市径流模拟的比较

获取原文
获取原文并翻译 | 示例
           

摘要

The current FORTRAN code of SWAT (SWAT2012) is being rebuilt to ease new model and module development by incorporating object-oriented programming techniques into defining spatial objects and calculating variables. SWAT+, the new SWAT code, is expected to offer flexible watershed representation with linked spatial objects. Ideally, SWAT+ produces outputs that are comparable to SWAT2012, if not identical, when the two versions of SWAT are set with the same input for a watershed. However, the drastic restructuring of the source code may cause unexpected results in the output, especially when compared with the current SWAT2012 model that has a long history of model validation. In this technical note, we compare sub-daily, daily, and monthly hydrographs provided by SWAT2012 and SWAT+ that were prepared for a small urban watershed in Austin, Texas. The model parameters were calibrated to 15 min and daily runoff observed in the watershed. SWAT+ was on par with SWAT2012 in predicting streamflow at daily and monthly scales. However, the HRU-level flow routing scheme newly added to SWAT+ created multiple peaks in the sub-daily hydrographs, suggesting a need to further improve the water transport simulation strategies. This technical note provides ideas of how SWAT+ is organized and if a SWAT modeler can maintain consistency in modeling results when shifting from the original code to the new code. In addition, this technical note discusses the potential for improved SWAT+ modeling.
机译:通过将面向对象的编程技术合并到定义空间对象和计算变量,重建了SWAT(SWAT2012)的当前FORTRAN代码以简化新模型和模块开发。 WAT +,新的SWAT码,预计将提供具有链接空间对象的灵活的流域表示。理想情况下,SWAT +生成与SWAT2012相当的输出,如果没有相同的话,当使用与流域的相同输入设置的SWAT时。但是,源代码的次数重组可能导致输出中的意外结果,尤其是与具有模型验证历史悠久的当前SWAT2012模型相比。在这本技术说明中,我们比较Swat2012和SWAT +提供的亚日,每日和每月水文编程,该次级为德克萨斯州奥斯汀的小城市流域准备。模型参数校准到15分钟,并在流域中观察到每日径流。 SWAT +与SWAT2012有关,以便在日常和每月尺度上预测流流程。然而,新添加到SWAT +的HRU级流量路由方案在次日文照片中创造了多个峰,这表明需要进一步改善水运输模拟策略。此技术说明提供了组织SWAT +的想法,如果SWAT建模器可以在从原始代码转换到新代码时,可以在建模结果中保持一致性。此外,本技术说明讨论了改进的SWAT +建模的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号