...
首页> 外文期刊>Ti02 Worldwide Update >BASE RESOURCES: Nearly AH the Kwale Ilmenite & 80% of the Zircon Goes to China
【24h】

BASE RESOURCES: Nearly AH the Kwale Ilmenite & 80% of the Zircon Goes to China

机译:基础资源:几乎啊kwale ilmenite&80%的锆石去了中国

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Reflecting the fact that Base Resources is now encountering lower ore grades, the company's unit operating costs have been more or less steadily rising. During 2015/16, they were typically within the range $US 84-93 per tonne of finished product in each quarter. During 2018/19, the range was $US 103-138 per tonne of finished product. Following the move to the South Dune, unit operating costs surged to $US 173 per tonne in Q3 2019. The upsurge was exacerbated by the significant drop in quarterly output levels. With higher output of all products in Q4 2019, unit operating costs subsided to $US 140 per tonne. Inevitably, because of the lower volumes of output from South Dune, the company's sales volumes have fallen, in comparison against previous years.
机译:反映了基础资源目前正在遇到下矿等级的事实,公司的单位运营成本已经或多或少地升高。 2015/16年度,它们通常在每季度每吨成品84-93美元的范围内。 2018/19期间,该范围为每吨成品103-138美元。 举行南沙丘后,2019年第四季度,单位运营成本飙升至每吨173美元。季度产出水平的显着下降加剧了。 较高产出所有产品的所有产品于2019年第四季度,单位运营成本消退为每吨140美元。 不可避免地,由于南沙丘的产量较低,公司的销售量与前几年相比下降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号