...
首页> 外文期刊>Ti02 Worldwide Update >BASE RESOURCES: Future Growth Hinges on the Toliara (Madagascar) Project
【24h】

BASE RESOURCES: Future Growth Hinges on the Toliara (Madagascar) Project

机译:基础资源:Toliara(马达加斯加)项目的未来增长铰链

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Assuming a positive financial decision in September 2020 to go ahead with the $US 442 million capital investment, shipments of finished products from Toliara should commence in December 2022. Over the first 27 years, production from Toliara is expected to average: 814,000 t.p.a. of ilmenite; 7000 t.p.a. of rutile; and 55,000 t.p.a. of zircon. (See also this issue of TiOi Worldwide Update, pages 35-43). Acquiring and developing the Toliara resource was seen as the best way to fully capitalise on the company's capability and experience accumulated from working at Kwale.
机译:假设9月2020年9月的肯定财务决定达到4.42亿美元的资本投资,从托拉卡的成品出货量应于2022年12月开始。在前27年中,托莱亚加的生产预计将平均:814,000吨.A。 ilmenite; 7000 t.p.a. 金红石; 和55,000吨.A. 锆石。 (另请参阅第35-43页的TIOI Worldwide更新问题。 获取和开发Toliara Resource被视为充分利用公司能力和在kwale工作中积累的最佳方式的最佳方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号