...
首页> 外文期刊>The Inspectioneering Journal >HOW INFERIOR UT PROCEDURES AND PRACTICES ON PRESSURE VESSELS COST $1 MILLION IN TURNAROUND REPAIRS: CASE STUDY 2 OF2
【24h】

HOW INFERIOR UT PROCEDURES AND PRACTICES ON PRESSURE VESSELS COST $1 MILLION IN TURNAROUND REPAIRS: CASE STUDY 2 OF2

机译:UT程序如何和压力容器的实践在周转修理中造成100万美元:案例研究2 of2

获取原文
获取原文并翻译 | 示例
           

摘要

This is Part 2 of a two-part case study discussing the costly repairs that were needed on newly fabricated pressure vessels. During the fabrication process, all of the Category "D" nozzle welds required ultrasonic examination per the requirements of Appendix 12 of the Section VIII, Div.1 ASME code. Upon delivery to the job site, the receipt inspection revealed seven of the eight vessels contained poor workmanship and rejectable defects in the Category "D" nozzle welds. A total of 57 nozzle repairs were needed prior to placing the vessels into service. The discrepant areas identified in this case study are as follows: 1. Inadequately written UT procedures; 2. Improper and poor implementation of the UT procedures; 3. Inadequate UT reporting; 4. Poorly trained UT examiners.
机译:这是两部分案例研究的第2部分,讨论了新制造的压力容器所需的昂贵维修。 在制造过程中,所有类别的“D”喷嘴焊接需要根据VIII,Div.1 ASME代码的第12节附录12的要求所需超声波检查。 在交付到就业现场后,收据检查揭示了八艘船中的七个含有差的工艺和“D”喷嘴焊接类别的拒绝缺陷。 在将船舶放入服务之前,需要共有57个喷嘴维修。 在本案研究中确定的差异区域如下:1。写入UT程序不充分; 2. UT程序的不当和差的实施; 3. UT报告不足; 4.训练有素差劲审查员。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号