...
首页> 外文期刊>The Inspectioneering Journal >FIGHT-OR-FLIGHT INSPECTION: DON'T LET BIG FINDINGS CLOUD THE BIG PICTURE
【24h】

FIGHT-OR-FLIGHT INSPECTION: DON'T LET BIG FINDINGS CLOUD THE BIG PICTURE

机译:战斗或飞行检查:不要让大发现云大局

获取原文
获取原文并翻译 | 示例

摘要

As turnaround inspection specialists, we participate in scheduled unit outages at various owner/user facilities. Each of these facilities, having their own collection of procedures and practices with years spent meticulously planning and preparing for these events. Input has been collected from all major organizational entities of the site (operations, maintenance, mechanical integrity, et al) and step-by-step work plans have been generated, including detailed inspection plans and repair scopes for each piece of equipment that will be serviced. Also included in these plans are forecasted budget growths and float times for discovery-related inspection findings on each piece of equipment. Major factors for determining allocations for growth are the review of visual inspection histories, thickness data, and operating conditions since the last inspection or maintenance event.
机译:作为周转检查专家,我们参加了各个所有者/用户设施的预定单位停电。 这些设施中的每一个,拥有他们自己的程序和实践,几年都花费了精心规划和准备这些事件。 已从本网站的所有主要组织实体收集的输入(操作,维护,机械完整等,等等),并生成了逐步的工作计划,包括每个设备的详细检查计划和修复范围 服务。 这些计划中还包含预计在每块设备上的探索相关检验结果的预算增长和浮动时间。 自上次检查或维护事件以来,用于确定增长分配的主要因素是审查目视检查历史,厚度数据和操作条件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号