...
首页> 外文期刊>The Indian mining & engineering journal >Stope Stability in Underground Manganese Mine - A Case Study of Munsar Mine of MOIL Limited
【24h】

Stope Stability in Underground Manganese Mine - A Case Study of Munsar Mine of MOIL Limited

机译:地下锰矿的Stope稳定性 - 以Moil Limited Munsar Lims为例

获取原文
获取原文并翻译 | 示例
           

摘要

MOIL Limited is operating 7 underground and 3 opencast mines in central India and producing annually more than 1.2 million tonnes of various grades of manganese ore. The Munsar mine is being worked since 1903. The opencast mining is presently stopped. The ore body below the opencast quarry is geological continuity of the area excavated in past by underground mining through the adit in three levels i.e. 270'L, 220'L, 170'L and by incline in western part of the property at 70'L. The horizontal drift development has been developed in the manganese ore body with sill drive 5 m above the sill pillar in lower level at 70'L and barrier pillar of 5 m thickness is left for protection of upper level at 170'L. Valuable mineral has been locked in sill pillar and therefore stope stability design, investigations and analysis have been carried out for excavation of manganese ore. On the basis of study now the drift development has been carried out in footwall rock at 70'L, (-) 30'L and below levels and it has improved the mineable manganese ore by about 20%. The paper presents stope stability design, modeling and changes in stoping method for better safety and productivity at Munsar Mine
机译:Moil Limited在印度中部运营7个地下和3个Opencast地雷,每年生产超过120万吨锰矿矿石。自1903年以来,Munsar矿正在努力。目前停止了露天采矿。 Opencast采石场下面的矿体是通过三级的地下挖掘到过去的地下挖掘的地区的地质连续性,即在70'L的财产中的西部倾斜和倾斜。锰矿石在锰矿石体中开发的水平漂移开发,5米在70'L厚度下较低水平的机架柱,厚度为5米的屏障柱,以保护在170'L上的上层保护。有价值的矿物已被锁定在窗台柱上,因此采取了稳定性设计,对锰矿石的开挖进行了调查和分析。在研究的基础上,现在漂移开发已经在70'L,( - )30'L和低于水平的脚壁岩石中进行,并且它已经改善了碎锰矿矿量约20%。本文介绍了Munsar矿井更好的安全性和生产力的稳定性设计,建模和变化

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号