...
首页> 外文期刊>Quaternaire >IMPACTS OF HYDRAULIC INSTALLATIONS ON NORMANDY RIVERS FOR 2000 YEARS, FIRST RESULTS OF A GEOMORPHOLOGICAL AND GEOARCHAEOLOGICAL APPROACH IN THE MIDDLE OF THE SEULLES VALLEY
【24h】

IMPACTS OF HYDRAULIC INSTALLATIONS ON NORMANDY RIVERS FOR 2000 YEARS, FIRST RESULTS OF A GEOMORPHOLOGICAL AND GEOARCHAEOLOGICAL APPROACH IN THE MIDDLE OF THE SEULLES VALLEY

机译:液压装置对诺曼底河流2000年的影响,首先是山谷中间的地貌和地球研引力方法的首要结果

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

There is fragmentary knowledge of the hydrosedimentary dynamics of rivers in Normandy before and during the installation of numerous watermills dating from the Middle Ages and onwards. The rates of erosion and sedimentation that have occurred in Norman rivers over the last two millennia are poorly understood as are the anthropogenic and climatic forces which have influenced these processes. The current issue is to understand and measure the inheritances in the current functioning of rivers in order to help with their contemporary management. To provide answers, geomorphological and geoarchaeological research has been carried out in the middle of the Seulles valley. These studies highlight the effects of the hydraulic structures, particularly mills in the past floodplain dynamics. Indeed, the complete control of water flow since the Middle Ages has completely artificialized the riverbed, the channel slope and partitioned the river favouring lateral stability and overbank sedimentation. Watermill construction was accompanied locally by a simplification of the course of the Seulles as on the Heuze site where a large part of the current course is artificial. These artificial changes to the river course and the acceleration of silt sedimentation in the floodplain since the medieval period are responsible for the establishment of the dynamic equilibrium and the hydrosedimentary forms of the current Seulles River. The end of the management of these hydraulic structures and their destruction during the last fifty years has had its effect on the natural balance of the river.
机译:在诺曼底之前和在安装众多从中世纪和向后的途中的河流的河流受欢迎动态的局部知识。在过去两千年中诺曼河流发生的侵蚀和沉降率较差地理解为影响这些过程的人为和气候力。目前的问题是理解和衡量河流当前运作中的继承,以帮助他们当代管理。为了提供答案,在沙坡中间进行了地貌和地理学研究。这些研究突出了液压结构的影响,特别是磨机在过去的洪泛区动态。实际上,水流完全控制以来中世纪完全易于瓦林河床,通道斜坡,并划分河流的河流,有利于横向稳定性和过度堆叠沉降。通过简单地伴随着派对的途径,伴随着汉语的大部分当前课程是人为的。这些人为改变河流过程和洪水平坦淤泥沉降以来,自中世纪时期负责建立动态均衡和当前被海盗河的热门形式。这些液压结构的管理结束及其在过去五十年中的破坏已经对河流的自然平衡产生了影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号