首页> 外文期刊>BHM Berg und Huttenmannische Monatshefte >5.4 million dollars mine hoist order is DavyMarkham's first in Peru
【24h】

5.4 million dollars mine hoist order is DavyMarkham's first in Peru

机译:540万美元的矿用提升机订单是戴维·马克汉姆在秘鲁的第一笔订单

获取原文
获取原文并翻译 | 示例
           

摘要

Sheffield heavy engineering Company, DavyMarkham, has secured an important $ 5.4 million contract for the supply of two heavy duty mining hoists to Volcan Compania Minera of Peru, the fourth largest producer of zinc and silver worldwide. The order is for production and Service hoists forVolcan's latest Pique Andaychagua mining project in the Yuauli province, some 150 km northeast of the Peruvian capital Lima, which will be designed for an estimated production rate of 4,000 tonnes per day from depths down to 970 m. This is DavyMarkham's first contract gain in Peru, which occupies a leading position in the global production of silver, gold, lead, copper and zinc, with the potential of soon becoming the mining industry leader in Latin America, according to market experts.
机译:谢菲尔德重型工程公司DavyMarkham已获得一份重要的540万美元合同,向秘鲁的Volcan Compania Minera(世界第四大锌和银生产商)提供两台重型采矿葫芦。该订单是为沃尔康在秘鲁首都利马东北约150公里处的尤阿利省的瓦尤省最新的Pique Andaychagua采矿项目提供生产和服务升降机的,该项目的设计产量为深至970 m的日产量估计为4,000吨。据市场专家称,这是达维·马克汉姆(DavyMarkham)在秘鲁的首笔合同获得,该合同在白银,金,铅,铜和锌的全球生产中占据领先地位,并有可能很快成为拉丁美洲采矿业的领导者。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号