首页> 外文期刊>Preston Pipe & Tube Report >Canadian Market Analysis (Con’t) --Source: Statistics Canada, Preston Estimates
【24h】

Canadian Market Analysis (Con’t) --Source: Statistics Canada, Preston Estimates

机译:加拿大市场分析(不) - 苏尔邦斯统计,普雷斯顿估计

获取原文
获取原文并翻译 | 示例
           

摘要

According to a new study by the Fraser Institute, insufficient pipeline capacity costCanada’s energy sector $20.6 billion — or 1% of the country’s economy — in missed revenuesin 2018. The lack of transportation capacity has widened the differential between US &Canadian crude and has kept Canadian drillers from investing in resource development. Areview of the scorecard finds that the Northern Gateway and Energy East projects have beencancelled and the Trans Mountain expansion, Line 3 replacement and Keystone XL pipelineremain mired in delay.
机译:根据弗雷泽研究所的一项新研究,管道能力不足,Costcanada的能源部门的能源部门206亿美元 - 或者占该国经济的1% - 在未错过的Revenuesin 2018中。缺乏运输能力在美国和加拿大原油之间延长了差异化,并留下了加拿大钻孔 从投资资源开发。 ScoreCard的威尔卡认为,北部网关和能源东部项目已经大不变,跨山脉扩张,第3行更换和Keystone XL Pipelineremain延迟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号