【24h】

THE OCTG MARKET

机译:八歌市场

获取原文
获取原文并翻译 | 示例
           

摘要

Before horizontal drilling andcompletion costs became 60% or so of the costof the well, drilled but uncompleted wells werecertainly not in the oilfield consciousness. We,and others, have written about the inventory ofready to complete wells that was being createdand what the likely effect would be in terms ofnew drilling. Our position was and is that new drilling would likely be delayed as DUCinventory was liquidated. The issue at theforefront was more about oil production thanabout OCTG because most of the OCTG isinstalled in the drilling process.
机译:在水平钻井和补充成本之前,井中的速度达到了60%左右,钻孔但未完成的井不在油田意识中。 我们和其他人已经写过库存,以完成正在创造的井,这是可能在新的钻井方面的影响。 我们的立场是,新的钻探可能会被延迟,因为Ducinventory清算。 Forefront的问题更多关于石油生产的Octg,因为大多数Octg都是在钻井过程中的安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号