...
首页> 外文期刊>Power: The Magazine of Power Generation and Plant Energy Systems >Andong Combined Cycle Power Plant, Andong, South Korea
【24h】

Andong Combined Cycle Power Plant, Andong, South Korea

机译:韩国安东克综合循环发电厂

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

For a country focused on wooing big businesses, constructing large industrial complexes, and building new administration offices, having a reliable electricity supply is vital. But with few natural resources, flexible and efficient generation is imperative. Korea Southern Power Co. (KOSPO) CEO Lee Sang Ho has a vision of making KOSPO into a "global top 10 power company" with the highest possible efficiencies and the best overall cost reductions as its core strategies. The Andong combined cycle power plant (CCPP) - a 417-MW gas-fired plant utilizing Siemens H-class technology - fits this vision and is a worthy POWER Top Plant. The plant was constructed in record time - only 24 months - through the teamwork of KOSPO, Siemens AG, and GS Engineering and Construction Corp. (GS E&C). Previous projects of this kind had taken between 30 and 40 months to complete, but improved planning and timing of critical component deliveries made schedule compression possible.
机译:对于一个专注于求求大企业,构建大型工业综合体,建设新的行政办公室的国家,具有可靠的电力供应至关重要。 但随着自然资源少,灵活高效的一代是必不可少的。 韩国南方电力公司(Kospo)首席执行官Lee Sang Ho有一个愿景,使KOSPO成为“全球十大电力公司”,具有最高的效率,以及其核心战略的最佳成本降低。 Andong联合循环电厂(CCPP) - 利用西门子H级技术的417兆瓦燃气厂 - 适合这种愿景,是一个有价值的电力顶级厂。 该植物以创纪录的时间建造 - 仅24个月 - 通过Kospo,Siemens AG和GS Engineering and Construction Corp.的团队合作(GS E&C)。 以前的这种项目在30到40个月之间才能完成,但改善关键部件交付的规划和时间,使得调度压缩成为可能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号