首页> 外文期刊>Plasma Science & Technology >Long-pulse power-supply system for EAST neutral-beam injectors
【24h】

Long-pulse power-supply system for EAST neutral-beam injectors

机译:东中性梁注入器的长脉冲电源系统

获取原文
获取原文并翻译 | 示例
           

摘要

The long-pulse power-supply system equipped for the 4 MW beam-power ion source is comprised of three units at ASIPP (Institute of Plasma Physics, Chinese Academy of Sciences): one for the neutral-beam test stand and two for the EAST neutral-beam injectors (NBI-1 and NBI-2, respectively). Each power supply system consists of two low voltage and high current DC power supplies for plasma generation of the ion source, and two high voltage and high current DC power supplies for the accelerator grid system. The operation range of the NB power supply is about 80 percent of the design value, which is the safe and stable operation range. At the neutral-beam test stand, a hydrogen ion beam with a beam pulse of 150 s, beam power of 1.5 MW and beam energy of 50 keV was achieved during the long-pulse testing experiments. The result shows that the power-supply system meets the requirements of the EAST-NBIs fully and lays a basis for achieving plasma heating.
机译:配备4兆瓦电流离子源的长脉冲电源系统由ASIPP(中国科学院等离子物理研究所)组成:一个用于中性梁测试支架,两个用于东部 中性束注射器(分别为NBI-1和NBI-2)。 每个电源系统由两个低电压和高电流直流电源组成,用于等离子体产生离子源,以及用于加速器网格系统的两个高电压和高电流直流电源。 Nb电源的操作范围约为设计值的80%,这是安全稳定的操作范围。 在中性光束试验台上,在长脉冲测试实验期间,在长脉冲测试实验期间实现了具有150秒的光束脉冲的氢离子束,1.5mW的光束功率和50keV的光束能量。 结果表明,电源系统完全满足了East-Nbis的要求,并为实现等离子体加热奠定基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号