...
首页> 外文期刊>platts Inside FERC's Gas Market Report >Environmentalists call on US FERC to halt Atlantic Coast project work after ruling
【24h】

Environmentalists call on US FERC to halt Atlantic Coast project work after ruling

机译:环保主义者呼吁美国FERC在裁决后停止大西洋海岸项目工作

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A day after the US Court of Appeals for the 4th Circuit struck down another permit for the Atlantic Coast Pipeline, environmentalists called on the US Federal Energy Regulatory Commission to halt work on the natural gas project, and some analysts are also suggesting such a temporary halt is possible. The 600-mile, 1.5 Bcf/d pipeline project, stretching from Harrison County, West Virginia, to Virginia and North Carolina, is part of a batch of projects totaling 6.5 Bcf/d in capacity that would take Appalachian supply to downstream markets in the Mid-Atlantic region. S&P Global Platts Analytics is currently tracking over 10.5 GW of gas-fired generation in North Carolina, Virginia, and Maryland that is scheduled to come online by the start of 2025. Some 4 GW of gas-fired generation has already entered service in the three states since the beginning of 2017.
机译:美国法院在第四次巡回赛的上诉法院击中了大西洋海岸管道的另一个许可证,环保主义者呼吁美国联邦能源监管委员会停止在天然气项目上工作,一些分析师也暗示这种暂时停止 是可能的。 从哈里森县,西弗吉尼亚州的600英里,1.5 BCF / D管道项目到弗吉尼亚州和北卡罗来纳州的一部分是总共6.5个BCF / D的能力,这将使阿巴拉契亚供应到下游市场 中大西洋地区。 S&P Global Platts Analytics目前正在追踪北卡罗来纳州,弗吉尼亚州和马里兰州的燃气发电量超过10.5 GW,计划于2025年代开始上网。大约4千瓦的燃气发电已经在三个中输入了服务 自2017年初以来的各国。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号