...
首页> 外文期刊>Pit & Quarry >CONVEYING & MATERIAL HANDLING
【24h】

CONVEYING & MATERIAL HANDLING

机译:输送和物料搬运

获取原文
获取原文并翻译 | 示例

摘要

Production slowdowns are a great time to inventory your critical components to prepare for the coming upswing. Take this time to review your production equipment and consider which components are critical to keep you running. These might include motors, gear units, pumps and large bearings.Check the health of those components, perform any overdue or upcoming maintenance, and build an inventory catalog with equipment details like functional location, component type, manufacturer, model number and serial number. Some components can be difficult to reach, so keep a photo of the nameplate in a binder, maintenance folder or spreadsheet so it can be easily accessed.
机译:生产放缓是清点您的关键组件准备即将到来的上升的好时机。 花费这次审查您的生产设备,并考虑哪些组件对您运行至关重要。 这些可能包括电机,齿轮单元,泵和大型轴承。检查这些组件的健康,执行任何逾期或即将到来的维护,并使用像功能位置,组件类型,制造商,型号和序列号等设备详细信息构建库存目录。 一些组件可能难以触及,因此将铭牌的照片保留在活页夹,维护文件夹或电子表格中,因此可以轻松访问它。

著录项

  • 来源
    《Pit & Quarry 》 |2020年第4期| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿山开采 ;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号