...
首页> 外文期刊>Petroleum Economist >Testing times for Alberta's oil sands
【24h】

Testing times for Alberta's oil sands

机译:Alberta油砂的测试时间

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

RISING capital costs are threatening the economics of several Alberta oil-sands projects.The cost for a new production facility has reached at least C160,000(148,000)per flowing barrel,compared with industry standards of C100,000 two years ago and C45,000 in the late 1990s.Without factoring in the full effect of the global credit crisis and the unknown costs of carbon-emissions-reduction policies planned by the Canadian government(see plO),the " chances of raising the estimated C170bff of capital required to keep projects on track"over the next decade are evaporating.
机译:资本成本上升威胁着几个艾伯塔省石油沙滩项目的经济学。新生产设施的成本至少达到了每次流动桶中的至少C160,000(148,000),而两年前C100,000的行业标准相比,C45, 000在1990年代后期。在全球信贷危机的全部效果和加拿大政府(见PLO)计划的全球信贷危机的全额效应和未知成本中,“提高了估计的C170BFF所要求的资本的机会” 在未来十年内,在轨道上保持项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号