...
首页> 外文期刊>Steel & Metallurgy >ArcelorMittal contracts SMS group for hot strip mill modernisation at Dunkirk
【24h】

ArcelorMittal contracts SMS group for hot strip mill modernisation at Dunkirk

机译:ArcelorMittal在Dunkirk的热带磨机现代化的SMS组

获取原文
获取原文并翻译 | 示例

摘要

Modernisation will be implemented in three steps. PCFC? will be installed as early as at the end of 2017 and operate in parallel with the existing control system. This so-called shadow mode makes it possible to check all functions of the PCFC?, the inter-play with the automation environment, and allows adaptation to the products of ArcelorMittal Dunkirk. In the end, this way of proceeding guarantees a smooth start-up of the new system. This start-up of the PCFC? will take place after the installation of the new bending and shifting systems in the first four stands during the annual shutdown scheduled for August 2018. The modernisation of stands F5 to F7 will follow one year later.
机译:现代化将以三个步骤实施。 PCFC? 将于2017年底尽早安装,并与现有控制系统并行运行。 这种所谓的荫模式可以检查PCFC的所有功能吗?,与自动化环境的互相播放,并允许适应ArcelOmittal Dunkirk的产品。 最后,这种方法保证了新系统的顺利启动。 这个PCFC的启动? 在2018年8月的年度关机期间,在前四个支架中安装新的弯曲和移位系统之后将进行。在一年后,F5至F7的现代化将遵循。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号