When a high traffic aisle at Kawasaki Precision Machinery needed a permanent repair solution, Permaban Signature AR was an obvious choice, as Steve Swan of RCR Flooring Products explains. The Kawasaki Precision Machinery (KPM) factory in Plymouth was built in the 1980s. The damaged joint at KPM was in an existing aisle with heavy forklift traffic, and although a previous mortar repair to the joint had been carried out, the area had degraded through use. This is not an uncommon problem, as mortar repairs are not a permanent joint repair solution.
展开▼