...
【24h】

Construction Site Communication Study Using the RAM Management System for BIM Adaptation

机译:建设现场通信研究采用RAM管理系统进行BIM适应

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The UK's construction industry is witnessing an annual increase in costs due to a lack of communication between the different organizational operators on the construction site that often leads to construction defects. Meanwhile, a cost-reduction strategy plan using BIM has become a fundamental requirement for the government, aiming to keep costs under control. To facilitate BIM adoption in the industry, the BIM strategy was introduced in four phases, with each stage entailing a number of criteria. The industry has seen a global reaction to the Level 2 BIM program and a significant cost saving of 840M in 2013/14 in Europe. However, the industry is unable to match the level 3 BIM, where a collaborative model file server is required as a common sharable platform to achieve efficient communication. This study contributes toward formulating a communication framework in the UK industry to understand communication issues and manage defects. A survey was targeted at construction industry practitioners and academics, with a total number of 328 participants.
机译:由于建筑工地上的不同组织运营商之间缺乏沟通,英国的建筑行业目睹了成本的年增长率,通常会导致建筑缺陷。与此同时,使用BIM的成本减少策略计划已成为政府的根本要求,旨在保障维持成本。为方便BIM在行业采用,BIM策略在四个阶段引入,每个阶段都有一些标准。该行业已对2级BIM计划的全球反应以及2013/14在欧洲的840亿美元的显着节省。但是,该行业无法匹配3级BIM,其中协同模型文件服务器是常见的可共享平台,以实现有效的通信。本研究有助于制定英国行业的通信框架,了解通信问题和管理缺陷。一项调查是在建筑行业从业者和学者的目标,总数为328名参与者。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号