首页> 外文期刊>NGW's Gas Market Reconnaissance >The US Coast Guard has conducted a safety inspection of Sempra Energy’s Cameron LNG with the Louisiana-based project on schedule to receive feed gas during the first quarter even as one of the builders reported cost overruns
【24h】

The US Coast Guard has conducted a safety inspection of Sempra Energy’s Cameron LNG with the Louisiana-based project on schedule to receive feed gas during the first quarter even as one of the builders reported cost overruns

机译:美国海岸警卫队对Sempra Energy的Cameron LNG进行了安全检查,其中基于路易斯安那州的项目,即使其中一个建筑商报告过繁荣

获取原文
获取原文并翻译 | 示例
           

摘要

The inspection came even as one of the project’s builders,McDermott International said during its quarterly earnings call that it had incurred a $168 million charge for cost overruns.The $6 billion project,located in Hackberry,Louisiana,is expected to produce about 12 million tons of LNG per year(1.6 Bcf/d).
机译:麦克塞摩特国际在季度盈利期间表示,该检验甚至是该项目的建设者之一,它在季度收益期间表示,它遭到了1.68亿美元的成本超支,它预计将生产大约1200万吨的60亿美元的项目。 LNG每年(1.6 BCF / D)。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号