首页> 外文期刊>NGW's Gas Market Reconnaissance >Mountain Valley Pipeline saw its problems multiply over the weekend as Virginia state regulators shut down work on a two-mile section of the line and a tree-sitting protest was upheld by a federal judge.
【24h】

Mountain Valley Pipeline saw its problems multiply over the weekend as Virginia state regulators shut down work on a two-mile section of the line and a tree-sitting protest was upheld by a federal judge.

机译:由于弗吉尼亚州监管机构在一系列两英里部分关闭工作,并通过联邦法官维持树木抗议活动,因此山谷管道在周末繁殖。

获取原文
获取原文并翻译 | 示例
       

摘要

Meanwhile, MVP has responded to allegations that the epoxy coating on unused pipeline could pose an environmental risk. Late last week, officials with the Virginia Department of Environmental Quality halted work along a two-mile stretch of the Mountain Valley Pipeline in eastern Montgomery County be stopped after finding "appalling" conditions at the site. Regulators faulted MVP compliance with an approved erosion and sediment control plan, noting missing control measures, as well as control devices that had not been maintained.
机译:同时,MVP已经回应了未使用的管道上环氧涂层可能构成环境风险的指控。 上周晚些时候,与弗吉尼亚州环境保护部的官员沿着两英里的山谷管道停止工作,在寻找网站的“令人震惊的”条件后,在东蒙哥马利县的山谷管道中停止。 监管机构的MVP符合批准的侵蚀和沉积物控制计划,注意到缺失控制措施以及尚未维护的控制设备。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号