首页> 外文期刊>NGW's Gas Market Reconnaissance >Jordan Cove Energy Project and Pacific Connector Gas Pipeline have filed applications with Ferc for the construction and operation of a 7.8 million ton per year (1 billion cubic feet of gas per day) LNG export terminal in Coos Bay, Oregon and the related Pacific Connector that will transport natural gas from the Malin Hub in southern Oregon to the LNG export terminal
【24h】

Jordan Cove Energy Project and Pacific Connector Gas Pipeline have filed applications with Ferc for the construction and operation of a 7.8 million ton per year (1 billion cubic feet of gas per day) LNG export terminal in Coos Bay, Oregon and the related Pacific Connector that will transport natural gas from the Malin Hub in southern Oregon to the LNG export terminal

机译:Jordan Cove Energy Project和Pacific连接器气体管道已经提交了FERC的申请,用于建造和运营每年780万吨(每天10亿立方英尺的天然气)在Coos Bay,俄勒冈州,俄勒冈州和相关太平洋连接器 将在俄勒冈州南部南部的麦林州枢纽运输天然气到LNG出口终端

获取原文
获取原文并翻译 | 示例
       

摘要

"Completing the pre-filing phase and submitting the formal applications to Ferc is a major milestone for the projects," said Veresen CEO Don Althoff. "We look forward to continuing our work with the local community, Tribal leaders and Ferc, as well as other federal and state agencies to advance Jordan Cove."
机译:“完成预先提交阶段并将正式申请提交给FERC是该项目的主要里程碑,”Veresen Ceo Don Althoff说。 “我们期待继续与当地社区,部落领导和FERC,以及其他联邦和州机构继续推进约旦湾。”

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号