...
首页> 外文期刊>NGW's Gas Market Reconnaissance >The Energy Information Administration reported a 73 billion cubic foot storage injection for the week ended Apr. 10 bringing working gas to 2,097 Bcf. A 64 Bcf build was expected.
【24h】

The Energy Information Administration reported a 73 billion cubic foot storage injection for the week ended Apr. 10 bringing working gas to 2,097 Bcf. A 64 Bcf build was expected.

机译:能源信息管理局报告了730亿立方英尺的储存注射,截至4月10日,将工作气体带到2,097 bcf。 预计64 BCF Build。

获取原文
获取原文并翻译 | 示例
           

摘要

The weekly injection was significantly higher than the 26 Bcf five-year average and matched last year’s injection. Storage is now 370 Bcf, or 21.4%, above the five-year average and 876 Bcf, or 71.7%, higher than a year ago (Storage report).
机译:每周注射显着高于26 BCF五年平均水平,并与去年的注射相匹配。 存储现在是370 BCF,或21.4%,以上五年平均值和876 BCF,或71.7%,高于一年前(存储报告)。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号