...
首页> 外文期刊>Landslides >The effect of check dams on the dynamic and bed entrainment processes of debris flows
【24h】

The effect of check dams on the dynamic and bed entrainment processes of debris flows

机译:滤压对碎片流动动态床夹带过程的影响

获取原文
获取原文并翻译 | 示例

摘要

Bed entrainment plays a significant role in the formational process of a debris flow. Thus the influence of bed entrainment may be an important factor which cannot be neglected when assessing the prevention effect of check dams. However, since few studies have investigated the interaction between check dams and debris flows with considering bed entrainment, the interactive effect of check dams on the dynamic and bed entrainment processes of debris flows remains unclear. Therefore, in this paper, an improved depth-averaged model is proposed to overcome this weakness. In the improved model, the impeding effect of a check dam is simplified as a rigid constraint, and a new computational scheme is adopted to improve the simulation efficiency. Using this model, the dynamic and bed entrainment processes of the catastrophic 2010 Hongchun gully debris flow are analyzed, and the effects of check dams on this debris flow are studied. The results show that the present model can properly depict the dynamic and bed entrainment processes of the Hongchun gully debris flow. Without bed entrainment, the flow quantity tends to decrease gradually from the upstream to the downstream, while the flow quantity will show an opposite tendency if bed entrainment is considered. The check dams can largely reduce the bed entrainment scale and flow quantity of this debris flow. Additionally, the prevention effect of check dams tends to be better when they are constructed at the upper part of the gully by constraining bed entrainment.
机译:床夹带在碎片流动的形成过程中起着重要作用。因此,床夹带的影响可能是在评估检查坝的预防效果时不能被忽略的重要因素。然而,由于在考虑床夹带的情况下研究了滤筒和碎片流动之间的相互作用,因此碎片流动的动态和卧床夹带过程中的滤压器的交互式效果仍不清楚。因此,在本文中,提出了一种改进的深度平均模型来克服这种弱点。在改进的模型中,将校验坝的阻抗效果被简化为刚性约束,采用新的计算方案来提高模拟效率。使用这种模型,分析了灾难性2010年灾难性沟壑的动态和卧床夹带流程,研究了检查水坝对这种碎片流动的影响。结果表明,本模型可以正确描述红春沟壑碎片流动的动态和床夹带过程。如果没有床夹带,流量往往会从上游逐渐降低,而流量将显示出床夹带的相反趋势。电阻坝可以大大降低该碎片流量的床夹带和流量。另外,通过约束床夹带在沟壑的上部构造时,止回阀的预防效果趋于更好。

著录项

  • 来源
    《Landslides 》 |2019年第11期| 共17页
  • 作者单位

    Chengdu Univ Technol State Key Lab Geohazard Prevent &

    Geoenvironm Pro Chengdu 610059 Sichuan Peoples R China;

    Chengdu Univ Technol State Key Lab Geohazard Prevent &

    Geoenvironm Pro Chengdu 610059 Sichuan Peoples R China;

    Chengdu Univ Technol State Key Lab Geohazard Prevent &

    Geoenvironm Pro Chengdu 610059 Sichuan Peoples R China;

    Changan Univ Dept Geol Engn Xian 710054 Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 崩塌 ;
  • 关键词

    Disaster prevention; Debris flow; Numerical simulation; Check dam; Bed entrainment;

    机译:防灾;碎片流动;数值模拟;检查大坝;卧床夹带;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号