...
首页> 外文期刊>NKK技報 >Construction of Bridge for the Trans-Tokyo-Bay Highway
【24h】

Construction of Bridge for the Trans-Tokyo-Bay Highway

机译:Trans-Tokyo-Bay Highway桥梁建设

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

NKK accepted the order for the construction of superstructure II for the Trans-Tokyo-Bay highway bridge project from the Trans-Tokyo-Bay Highway Corporation in 1992 and completed it in 1995. This highway bridge, the total length of which is 1630 m and the longest span of which is 240 m, is one of the largest girder bridges in Japan. We displayed our manufacturing and constructing techniques successfully through this project. Following this report, we give a summarized description of the design, manufacture, and construction as the characteristics of it.
机译:NKK于1992年从Trans-Tokyo-Bay Highway Corporation建造了跨东京海湾公路桥工程的上层建筑II的秩序,并于1995年完成。这座公路桥梁,其总长度为1630米 最长的跨度是240米,是日本最大的梁桥之一。 我们通过该项目展示了我们的制造和构造技术。 在本报告之后,我们提供了设计,制造和施工的总结描述作为其特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号