首页> 外文期刊>Lead & Zinc Outlook >Let’s Make a Deal
【24h】

Let’s Make a Deal

机译:让我们达成协议

获取原文
获取原文并翻译 | 示例
           

摘要

The rise in output from MMG’s 170ktpa Dugald River, Goldcorp’s 200ktpa Pe?asquito and Glencore’s 500ktpa MountIsa/Lady Loretta mines in 2018 will result in global zinc in concentrate supply increasing 4.6% to 13.8Mt. In 2019,concentrate supply growth will accelerate to 7.3% and total 14.8Mt due to New Century’s 270ktpa Century and Vedanta’s250ktpa Gamsberg. The rise in mine supply over 2018 and 2019 will stimulate refined zinc production. Global finished zincsupply is forecast to increase by 6.4% to 14.5Mt in 2018. In 2019, finished zinc supply growth will ease to 3.6% resulting infinished supply totalling 15.0Mt. Despite the additional supply, refined zinc deficits will persist over 2018 and 2019.
机译:MMG 170ktpa Dugald River的产量增加,Goldcorp的200ktpa PE?Asquito和Glencore的500ktpa Mountisa / Lady Loretta Mines将在2018年将导致全球锌的集中供应量增长4.6%至13.8mt。 2019年,由于新世纪270ktpa世纪和Vedanta's250ktpa Gamsberg,集中供给增长将加速至7.3%,共计14.8亿吨。 2018年和2019年的矿井供应量将刺激精制锌生产。 预计2018年全球成品ZINCSUPPLY预计将增加6.4%至14.5MT。2019年,成品锌供应增长将放松至3.6%,导致狭小的供应总额为15.0mt。 尽管提供了额外的供应,但精致的锌赤字将在2018年和2019年持续存在。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号