首页> 外文期刊>Lead & Zinc Outlook >Supply to Increase from Major Producers
【24h】

Supply to Increase from Major Producers

机译:供应增加主要生产商

获取原文
获取原文并翻译 | 示例
           

摘要

Teck Resources has raised 2017 production guidance for its Red Dog mine in Alaska by 50kt to 525–550kt of zincin zinc concentrate. Teck attributes the higher production to changes in mine sequencing and improvedmetallurgical recoveries, enabling higher grade mill feed with more ore from the Qanaiyaq pit in the Decemberhalf of 2017. Expected zinc production for the next five years is put at between 475ktpa and 550ktpa. This level ofoutput is to be enabled by a US$110m mill upgrade project that is expected to be completed by late 2019 andshould lift throughput by 15% over the remaining mine life to 2031. Increased throughput is to offset lower gradesand harder ore from the Aqqaluk pit.
机译:Teck Resources已经提高了2017年在阿拉斯加的红狗矿生产指导下的50kt至525-550kt的锌锌浓缩物。 Tect将越来越高的生产变化为矿井测序和改进的矿石回收率,使高等级的磨坊从2017年12月的Qanaiyaq坑中获得更多矿石。未来五年的预期锌产量介于475ktpa和550ktpa之间。 该级别的Output将由US $ 110M磨机升级项目启用,预计将于2019年底完成,并将耗资吞吐量占据了15%的剩余矿山生命,以至于2031年。增加的吞吐量是从AQQALUK抵消较低的毕业生 坑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号