首页> 外文期刊>Nuclear intelligence weekly >DOE’s $1.4 Billion for Uamps — Robbing Peter to Pay Paul?
【24h】

DOE’s $1.4 Billion for Uamps — Robbing Peter to Pay Paul?

机译:Doe为uamps的14亿美元 - 抢劫彼得支付保罗?

获取原文
获取原文并翻译 | 示例
           

摘要

The US Department of Energy (DOE) is poised to sweeten pros- pects for NuScale’s $6.1 billion frst-of-a-kind 720 MW small modular reactor (SMR) complex with an ostensibly massive increase in support — to the tune of $1.4 billion. The “multi- year award” is expected to be fnalized next week, ahead of a Sep. 15 deadline for participating members of project developer Utah Associated Municipal Power Systems (Uamps) to commit to the project’s next phase, which will cover development and submittal of a construction and operating license to the US Nuclear Regulatory Commission. The frst of 12 SMR modules, to be built at the Idaho National Laboratory (INL), is now slated for completion in 2029 instead of 2026, with the remaining 11 targeted for completion in 2030, and the targeted oftake price has been lowered to $55 per megawatt hour (in 2018 dollars) from the original $65/MWh.
机译:美国能源部(DOE)准备为NUSCALE的$ 61亿美元FRST-of-The-A-O-The-A-O-of-The-A-O-SMR)复合体进行甜蜜的PROF-PECTS,具有表面上的巨大增加,支持14亿美元。 “多年奖”预计下周将在下周进行麻烦.15项目开发商犹他州开发商犹他州犹他州犹他州(UAMS)的截止日期,以承诺该项目的下一阶段,将涵盖发展和提交 对美国核监管委员会的建设和运营许可。 在Idaho国家实验室(INL)内建造的12个SMR模块的FRST现在已经在2029年完成,而不是2026年,其余11名目标于2030年完成,而目标的欧姆特价格已降至55美元 每兆瓦的小时(2018美元)从原来的65美元/兆瓦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号