...
首页> 外文期刊>Nuclear intelligence weekly >Exorbitant Costs, Solar Energy Remove Luster From Paks II
【24h】

Exorbitant Costs, Solar Energy Remove Luster From Paks II

机译:过高的成本,太阳能去除PAKS II的光泽

获取原文
获取原文并翻译 | 示例
           

摘要

Hungary is attempting to expedite pre-construction work at Paks 2 in an attempt to make up some of the lost time, and the governmen of Prime Minister Viktor Orban recently received a key approval from the EU in this regard. Political leaders in Budapest are claiming that the Covid-19 pandemic only shows how badly the country will need the two VVER-1200 reactors. However, renewed concerns about the project's costs and a phenomenal surge in solar power production this spring have many Hungarians wondering whether Paks 2 is far more trouble than it is worth.
机译:匈牙利试图加快PAKS 2的建设前工作,试图弥补一些丢失的时间,总理维克托尔·斯坦斯的政府最近获得了欧盟在这方面的重点批准。 布达佩斯的政治领导人声称Covid-19大流行仅显示了该国需要两个Vver-1200反应堆的糟糕程度。 然而,今年春天重新对项目成本和太阳能产量的现象浪涌的担忧,有许多匈牙利人想知道PAKS 2是否比价值更麻烦。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号