...
首页> 外文期刊>Nuclear intelligence weekly >Diablo Canyon Cited for Violation Following Expedited Repairs
【24h】

Diablo Canyon Cited for Violation Following Expedited Repairs

机译:在加快维修后,暗黑破坏神峡谷被引用违规行为

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The US Nuclear Regulatory Commission (NRC) has cited Pacifc Gas and Electric (PG&E) for failing to heed industry warnings about piping corrosion in emergency response cooling systems and take preventative measures that would have avoided similar corrosion discovered at Diablo Canyon-2 this summer. The dis- covery of corrosion predated the agency’s controversial decision to approve expedited emergency repairs on the corresponding emergency response system at Unit 1 while the unit was still operating (NIW Aug.28’20). And it wasn’t until after those Unit 1 repairs were completed that NRC inspectors realized that PG&E had failed to heed the industry warnings from over a dec- ade earlier.
机译:美国核监管委员会(NRC)引用了Pacifc天然气和电气(PG&E),未经安全响应冷却系统中的管道腐蚀,并采取预防性措施,以避免在今年夏天在暗黑破坏神峡谷-2发现的类似腐蚀。 腐蚀的消除案涉及原子能机构的有争议的决定,以批准在单元1的相应应急系统上加快紧急维修,而该单位仍在运行(NIW.28'20)。 直到那些单位1维修完成,NRC检查员意识到PG&E未能从早些时候遵从该行业警告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号