Temporary Power Generation Keeps Wind Farm Construction Projects on Schedule

机译:临时发电会使风电场建设项目按计划进行

获取原文
获取原文并翻译 | 示例
           

摘要

It takes power to make power. While under construction, offshore wind farms need standby power from auxiliary generators for a range of functions. When provided reliably, the construction project is more likely to be complete on time. Throughout the wind farm construction and commissioning phases, temporary power for large and small loads can be supplied with a wide range of generators. Once the project is operational, other power needs arise. For the offshore construction phase, 30kW generators are provided and placed on the man-access platform (MAP) and are charged using a wind turbine. Such units power the various electrical equipment used during the initial construction phase. These units weigh less than a ton, so they can be lifted off by a davit crane without requiring a large vessel for the installation.
机译:它需要权力来掌握力量。 在建设中,海上风电场需要从辅助发电机的待机功率进行一系列功能。 当可靠提供时,建设项目更有可能按时完成。 在整个风电场建设和调试阶段,可以提供各种发电机的大型和小负荷的临时电力。 项目运行后,需要其他电力。 对于海上施工阶段,提供30kW发电机并放置在人类接入平台(MAP)上,并使用风力涡轮机充电。 这些单元为初始施工阶段期间使用的各种电气设备供电。 这些单位的重量小于吨,因此可以通过达瓦特起重机抬起,而无需大容器即可安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号