首页> 外文期刊>Natural Gas Week. >Summit Midstream Begins Open Season for Double E Gas System
【24h】

Summit Midstream Begins Open Season for Double E Gas System

机译:Summit中游开始开放季节,用于双E天然气系统

获取原文
获取原文并翻译 | 示例
           

摘要

Summit Midstream Partners is conducting a non-binding open season for capacity in its planned Double E Pipeline that will transport gas from Eddy County, New Mexico, where the company is constructing a gas processing plant, to the Waha Hub in West Texas. The line will carry an initial 1 billion cubic feet per day, expandable to 1.4 Bcf/d, beginning in the first quarter of 2021. Firm transportation service will be provided from multiple receipt points in the Delaware Basin to other pipelines around Waha. The cost of the 120-mile pipeline was not disclosed.
机译:Summit Midstream Partners在其计划的双E管道中进行了一个非约束式开放季节,该季节能够将来自新墨西哥州Eddy County的运输天然气,该公司正在建造天然气加工厂,在西德克萨斯州Waha枢纽。 该线将载入最初的10亿立方英尺,可扩展到1.4 BCF / D,从2021年第一季度开始。将于特拉华盆地的多个收据点提供公司的运输服务,到瓦哈周围的其他管道。 未透露120英里管道的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号