...
首页> 外文期刊>Metal Expert News >Pike River Coal (New Zealand) postpones bringing its coal mine to designed capacity
【24h】

Pike River Coal (New Zealand) postpones bringing its coal mine to designed capacity

机译:派克河煤炭(新西兰)推迟将其煤矿带到设计的能力

获取原文
获取原文并翻译 | 示例

摘要

Australian miner Pike River Coal has revised the schedule of bringing its coal mine, commissioned in January 2010,to designed capacity. The New Zealand mine consists of 2 seams: Brunner (58.5 mt of reserves) and Paparoa(18 mt). Currently the mining in Brunner is performed by traditional means and in Paparoa – by hydromining. Currentlythe mine is capable of producing about 35,000-40,000 tpy of hard coking coal.
机译:澳大利亚矿工派克河煤炭已修订了将煤矿委托,2010年1月委托,设计能力。 新西兰矿用2个接缝组成:布伦纳(储量58.5吨)和Paparoa(18吨)。 目前布伦纳的采矿是通过传统方式和帕特洛阿进行的 - 通过水力化。 目前矿井能够生产约35,000-40,000吨的硬焦煤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号