Renewing the Raised Track at Bradford MES - PART 2

机译:在布拉德福德MES更新凸起轨道 - 第2部分

获取原文
获取原文并翻译 | 示例
           

摘要

We employed a contractor with a small excavator to pull out the old steel 'A' frames along with their concrete footings and, following the line of these 'old' track supports, excavate a rough foundation trench (photo 8). Members then followed behind, hand trimming the trench as required, to fix the shuttering necessary to establish the required levels and transition curves, to allow the foundation concrete to be poured (photo 9). Whilst this was carried out, it became evident that we had a blocked land drain and this had to be excavated and a replacement drain pipe installed (photo 10). With this all complete, a start could be made on the rebuilding (photo 11).
机译:我们用一个小型挖掘机雇用承包商来拔出旧钢'A'框架以及它们的混凝土基础,并跟随这些“旧”轨道支撑的线路,挖掘粗糙的基础沟槽(照片8)。 随后的成员后面,手工修剪沟槽,以修复建立所需水平和过渡曲线所需的快门,以允许浇注基础混凝土(照片9)。 虽然这是在进行的同时,我们变得明显,我们有一个被封闭的陆地排水管,这必须被挖掘和安装更换排水管(照片10)。 凭借这一切,可以在重建时进行一开始(照片11)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号